Showing posts with label Tour of AVI demonstration site. Show all posts
Showing posts with label Tour of AVI demonstration site. Show all posts

1.28.2010

Tour of the Ashevillage Institute Demonstration Site Part 3

If we need the extra storm water for our system we can open the cleanout at the end of the pipe and let the water through. A slide valve would be more appropriate for this purpose but also more expensive.

Tour of the Ashevillage Institute Demonstration Site Part 2

Storm water runoff travels through our 4" pipe at a 2% grade.
The first flush of water that comes from a storm carries the most pollutants. The dirty water first flush is diverted into a 50 gallon barrel. The 50 gallon barrel has a 1/2" hole drilled in the bottom side to let the water slowly drain out between rain events.
For every 1mm of rainfall that's diverted through a first flush system 50% of the pollutants are removed.